Where are the PennDOT road projects for the week?
Meetinghouse Road bridge
Through Jan. 9: Meetinghouse Road will be closed and detoured 24/7 between Route 491 (Naaman Creek Road) and Chichester Avenue.
Ongoing projects
Route 3 (West Chester Pike): Through March 6, a lane closure around the clock eastbound between the I-476 South off-ramp and Lawrence Road, Marple and Haverford townships, roadway reconstruction.
Interstate 476 work
Jan. 5 through Jan. 8: 9 a.m. to 3 p.m., a lane closure northbound between the Plush Mill Road overpass and Media/Swarthmore Interchange (Exit 3) in Nether Providence and Springfield townships, to install and integrate Variable Speed Limit (VSL) and Queue Warning (QW) systems.
Conchester Highway
Periodic lane closures on U.S. 322 (Conchester Highway) in both directions between Cherry Tree Road/Bethel Avenue and Route 452 (Market Street) to allow crews to implement a long-term traffic shift.
The traffic shift will reduce U.S. 322 to one lane in each direction to allow PennDOT’s contractor to begin Stage 2 of construction. Stage 2 consists of new roadway and structure construction on the south side of U.S. 322, including the bridge over Route 452 (Market Street).
The existing long-term travel restrictions on U.S. 322 (Conchester Highway), Route 452 (Market Street), and Bethel Avenue will remain in place through 2026 to accommodate roadway widening and improvements.
Clifton Heights Middle School
Through March 2: 9 a.m. to 3 p.m. Springfield Road will be closed weekdays between Fairview Avenue and Oak Avenue.
Lansdowne Avenue corridor
The safety improvement project on Lansdowne Avenue includes upgrades at the following intersections: Marshall Road, Plumstead Avenue, Essex Avenue, Greenwood Avenue, Stewart Avenue, Baltimore Avenue, Providence Road, Baily Road and Mercy Fitzgerald Hospital. Completion is expected in spring.
Governor Printz Boulevard
Governor Printz Boulevard (Route 291): A 24/7 lane closure in each direction between Bartram Avenue/Scott Way and Stevens Drive for bridge replacement. No timetable provided for completion.
Route 420 work
Into summer 2027: One southbound lane of the Route 420 bridge over the Darby Creek to be closed 24/7 as a four-year project to refurbish and replace that span continues.
Sellers Avenue bridge
Through summer 2027: the intersection of Ridley and Ward avenues will be closed and detoured 24/7 for reconstruction. During the closure, Ridley Avenue and Ward Avenue motorists will be directed to follow the posted detour routes.
Aqua Pa. work
Steel Road: Through March 31, weekdays 9 a.m. to 6 p.m. closed and detoured between Burmont Road and Drexel Avenue in Haverford Township for Aqua Pennsylvania utility construction.
p.p1 {margin: 0.0px 0.0px 6.0px 0.0px; font: 16.0px Helvetica; background-color: #ffffff} span.s1 {font-kerning: none} span.s2 {text-decoration: underline ; font-kerning: none; color: #2f2f5d} span.s3 {font: 16.0px ‘Helvetica Neue’; font-kerning: none; color: #191c1f} span.s4 {font: 16.0px Helvetica; text-decoration: underline ; font-kerning: none; color: #2f2f5d}
This article appears courtesy of a content share agreement between Fideri News Network and The Media News Group. To read more stories like this, visit www.mainlinemedianews.com/ or https://www.delcotimes.com/.
